Sunday, February 8, 2015

Kitchen Progress!

When I last posted on this blog  about building the commercial kitchen, it was November and we were building the mound for the new septic system. We had decided to have the mound constructed on the far side of the west windbreak so that we wouldn’t have to see it so obviously and so it wouldn’t interfere with the pasture, garden or future car parking.  Many trees came down, as well as the old pig shed, and the hill turned out to be much bigger than I expected, but I am getting used to the terrain change and once it is covered with grass and meadow flowers, I imagine it could even become an attractive feature.
After the mound itself was finished, there was much more digging toward the barn.
Then even more digging toward the barn. And then trenching inside the entire length of the north end of the barn (which required moving all the stuff stored in there, including a huge woodpile, and of which I do not have any photos.) Our soil is mostly heavy clay. This part of the project was completed just as serious winter hit, so fortunately the mud quickly froze hard. But it is going to be very mucky come spring.

In December, we had a week-long thaw so the  well-drillers were able to begin work right before Christmas. They ended up drilling the new well in front of the barn.
I did not know that when a well is drilled, a LOT of mud is pumped out.
The weather turned very cold, so they pulled out their equipment for a few weeks, leaving a huge sea of clay mud that covered the yard in front of the barn and oozed out into the pasture. I cannot describe how dismaying this was. I was so relieved to get a big snowfall that covered it up so we didn't have to think about it so much.
When it warmed during a January thaw, the well-drillers returned and continued work. Water from the first aquifer had tested high for nitrates so they had to drill down into the Jordan aquifer,  580 feet. When I came home the evening they reached the Jordan, torrents of water were gushing through the garden on the north side of the driveway and through the pasture on the south side, rushing downhill to fill the ditches. It left gullies that will have to be repaired this spring, but on the bright side, it also washed most of the dismaying sea of mud away.  Between the septic  installation and the well installation, I estimate we will have about half an acre of mud to restore to grassy yard next spring.
While all of this work was going on outside, Rog was working inside the barn. He dug through the hard, rocky ground to pour footings for the new walls that will enclose the baking area, bathroom and storage room.
Cement mixers arrived to pour concrete for the footings.
Our friend Mike McMullen helped Rog build the walls and ceiling inside the north end of the barn.
Rog installed the door that will access the restroom from the outside
and insulation and vapor barrier.
Last weekend, Rog cut the opening in the wall from what will be the main kitchen to the baking room. There was a concrete curb foundation that needed to be cut out, and our two young bread-baker prospects (that will be another post)  offered to help cut the concrete out today.  When I came out to take a photo of the progress this afternoon, it was a bit dusty in there!
The opening is now ready to install the beautiful French doors! Well, after the dust is cleaned up.
Dust-covered Rog smiling after a very productive day’s work today. There is at least one more weekend's worth of messy concrete-sawing, to cut channels in the floor for the plumbing.  Then the plumber and electrician will be able to do their work, and THEN the fun part begins.   

2 comments:

Marcia said...

Read your posting while I was in NH visiting for my granddaughter's first birthday. You have made progress. Can't imagine how you handled all the mud. Looking forward to seeing the completed project.

Anonymous said...

We were lucky when it came to the mud slurry not running all over the ground. The hit a cavern when drilling so most of the mess remained out of sight. Unfortunately the cavity required a steel casing run deeper than we had anticipated, greatly increasing our costs. We've got some sweet water though.